Library News

The shelving for books in the renovated library is currently being installed. In order to do this, they have to bolt the frame and brace through the carpeting to the concrete below. Once those are in, the book shelves get attached to the uprights. So far, uprights are installed on half of the 6th floor. The next stage which is to install the shelves will take place in the next week or two.
On the 5th floor, the shelving layout is in progress. Various codes control the spacing and methods of securing the shelving so that’s where careful measuring and planning come in to play.
Meanwhile in our temporary offices, temp workers have been hired to help us with the move. Stay Tuned!